TheChimera
New Member
- Joined
- Mar 18, 2013
- Messages
- 32
- Reaction score
- 0
- Points
- 0
- Location
- Minnesota
- Vehicle Year
- 1987
- Make / Model
- Ford
- Engine Size
- 2.9l V6, soon goin bigger :-)
- Transmission
- Manual
First picture is all of the parts assembled on one bank. Had to make a bracket to shift the valve cover bolt holes and two little dams to seal off the lifter valley. They will be TIG welded to the intake spacers to create a solid unit which will drop on before the lower manifold and should seal everything. Was concerned about the oil pan as it didn't initially want to sit down, but a couple whacks with a dead blow moved the pickup enough to set it down. Second picture are the spacers rough fit in their positions. Their thicknesses will be determined by the deck height, which will be set after the sleeves are pressed in. So right now all material is very oversize, but close enough to test fitment. Third pic are the parts needed for this project, mind you two of everything and six sleeves.
Attachments
-
43.2 KB Views: 375
-
47.2 KB Views: 367
-
41.8 KB Views: 372