Made a little more progress today. I built a temporary transmission crossmember. I won’t build the permanent one until the suspension is finished beacause the frame brackets will get tied into the suspension mounts and will have the mounting points for the skid plate built in.
I slid the front axle housing under so I could start daydreaming about where all is the links will be located.
Fitting a double triangulate 4 link up front isn’t easy, but it looks like it’s going to work with this frame. It’ll be nice to not have a panhard.
I started tying the front sect of the rock sliders into the body
It’ll be a while before I weld the exo cage together, but I wanted to see what it will look like
Once I get the driver side finished, I can start building my core support.